Cloud Migration Services

Move to Cloud.
Move Without Risk.

Gensoft migrates your applications, databases, and infrastructure to AWS, Azure, or GCP — using the right strategy for each workload, with zero unplanned downtime, full data integrity verification, and a post-migration optimization phase to reduce your cloud bill.

30%Avg. Cloud Cost Savings
0Planned Downtime
3Cloud Platforms
100+Migrations Delivered
Free Migration Assessment
Tell Us What You're Running Today

We'll recommend a migration strategy and cost estimate within 48 hours

Cloud platforms and enterprise brands we've migrated workloads for

AWS
Microsoft Azure
Google Cloud
Shopify
Lenovo
Zoom
Migration Strategies

The 6 Migration Strategies — We Apply the Right One Per Workload

Not every application should be migrated the same way. We assess each workload independently and select the strategy that delivers the best balance of speed, cost, and cloud benefit.

Rehost
Lift & Shift

Move applications to cloud VMs with minimal changes. The fastest migration path — ideal when speed matters most and cloud optimization can happen incrementally post-migration. Reduces on-premise costs immediately.

Replatform
Lift, Tinker & Shift

Minor modifications to leverage managed cloud services — swapping a self-managed database for AWS RDS, or moving to a managed container service. Better performance and lower ops overhead without a full rewrite.

Refactor
Re-architect

Rebuild the application as cloud-native — microservices, containers, serverless functions, and managed cloud APIs. The highest ROI long-term, delivering full elasticity, auto-scaling, and multi-region resilience.

Repurchase
Drop & Shop

Replace a legacy on-premise system with a SaaS equivalent — e.g., replacing a custom CRM with Salesforce, or an on-premise email server with Microsoft 365. Often the most cost-effective option for commodity functions.

Retire
Decommission

Identify and shut down systems that are no longer used or justified. On average, 10–20% of systems in a migration discovery are candidates for retirement — immediately reducing migration scope and long-term cloud spend.

Retain
Keep On-Premise

Some workloads are best left where they are — due to compliance, latency requirements, hardware dependencies, or migration cost exceeding benefit. We identify these honestly and plan hybrid connectivity where needed.

Cloud Platforms

We Migrate to All Three Major Cloud Providers

We'll help you choose the right cloud based on your workloads, team skills, compliance requirements, and long-term cost profile — then migrate to it with confidence.

AWS
Amazon Web Services

The world's largest cloud platform with the widest service catalog. Best for companies needing maximum flexibility, global reach, and the deepest ecosystem of managed services — from AI to specialized databases.

EC2 & ECS RDS & Aurora S3 Lambda EKS CloudFront
Azure
Microsoft Azure

The preferred choice for enterprises already using Microsoft 365, .NET, or Active Directory. Azure's seamless Windows integration, hybrid cloud capabilities, and compliance certifications make it the enterprise default.

Virtual Machines Azure SQL AKS App Service Azure Functions
GCP
Google Cloud Platform

Google's infrastructure — the same network that powers Search, YouTube, and Gmail — offers unmatched data analytics, Kubernetes (Google invented it), and AI/ML capabilities for data-intensive workloads.

GKE BigQuery Cloud Run Cloud SQL Vertex AI
The Process

Our 8-Phase Cloud Migration Process

Every migration is different — but our structured process reduces risk and eliminates surprises at every stage.

Cloud Migration Process
01
Discovery & Inventory

We map every application, database, server, dependency, and integration in your current environment — creating a complete inventory that forms the foundation of the migration plan.

02
Workload Assessment & Strategy Selection

We assess each workload against the 6Rs framework — recommending a migration strategy, target architecture, and timeline for every component based on business value and technical complexity.

03
Cloud Architecture Design

We design the target cloud architecture — VPC layout, security groups, IAM policies, networking, managed services, and auto-scaling configuration — before any workload is moved.

04
Migration Planning & Sequencing

We sequence workloads by dependency and risk — migrating lower-risk, low-dependency systems first to build confidence and test the process before tackling business-critical components.

05
Migration Execution

We execute migrations in batches — using automated migration tools and Infrastructure as Code to keep changes tracked, reversible, and fully reproducible across environments.

06
Validation & Testing

After each migration wave, we run functional, performance, and data integrity checks to confirm the migrated system behaves identically to the source. Nothing is switched over until it passes.

07
Cutover & Go-Live

We execute the cutover during a low-traffic window with a tested rollback plan ready. DNS switches, database cut-overs, and traffic routing are coordinated to minimize risk and time-to-zero on-premise traffic.

08
Post-Migration Optimization

We right-size instances, enable reserved pricing, configure auto-scaling, and implement cloud cost governance — typically delivering 20–30% further cost reduction in the 60 days after go-live.

Why Move to Cloud

What Cloud Migration Unlocks for Your Business

Eliminate Capital Expenditure

Replace server hardware purchases, data center leases, and maintenance contracts with predictable monthly cloud opex — billed only for what you use.

Scale Instantly, in Any Direction

Auto-scaling handles traffic spikes without over-provisioning. Scale from 10 to 10,000 concurrent users without touching a server — and scale back down when the traffic drops.

Global Reach in Hours

Deploy to multiple regions across 6 continents to serve global users with low latency — without the cost and complexity of building or leasing data centers in each region.

Enterprise-Grade Security

AWS, Azure, and GCP maintain more compliance certifications than virtually any private data center can — including SOC2, ISO 27001, HIPAA, PCI-DSS, and GDPR-compliant infrastructure.

FAQ

Cloud Migration FAQs

Questions CIOs, CTOs, and engineering directors ask before starting a cloud migration.

Talk to a Cloud Architect

Migration timelines depend on the number of workloads, their complexity, and the chosen strategy. A single application lift-and-shift typically takes 4–8 weeks including planning, testing, and cutover. A full enterprise data center migration — with dozens of applications, database migrations, and re-architecture work — typically spans 6–18 months, executed in phased waves. We'll give you a realistic estimate after the discovery phase.

Our goal is zero unplanned downtime. For most workloads, we use live replication, blue-green deployment, or database sync techniques that allow us to cut over with minimal or zero production interruption. Where a brief maintenance window is genuinely unavoidable (e.g., stateful database migrations), we schedule it during off-peak hours and communicate the exact window in advance.

We run parallel validation checks at every stage — comparing row counts, checksums, and sample data between source and target before any cutover. For databases, we use CDC (Change Data Capture) to keep source and target in sync during migration, so no transactions are lost. We don't proceed to the next phase until the current phase passes all integrity checks.

The right choice depends on your specific situation: AWS is the safest general-purpose choice with the widest service catalog. Azure is the natural fit if you're heavily invested in Microsoft products (.NET, Windows Server, Active Directory, Office 365). GCP excels for data-intensive, AI/ML-heavy, or Kubernetes-native workloads. We'll give you an unbiased recommendation after understanding your stack, team skills, and compliance needs.

Every migration wave has a documented rollback plan that we test before execution. If a cutover fails or unexpected issues emerge, we revert to the source environment immediately — ensuring business continuity while we diagnose and resolve the issue. The on-premise environment remains live and accessible throughout the migration until the cloud environment has fully passed all acceptance tests.
Ready to Move?

Your Cloud Migration Starts With a Free Assessment.

Share your current infrastructure setup and business goals — we'll return a migration strategy, recommended cloud architecture, realistic timeline, and cost projection within 48 hours.

We sign an NDA before reviewing your infrastructure details.

Cloud Migration